–April 17, 2015
The steel framing is up and students are hard at work! 28 students from CU’s Masters in Architecture Design Build semester are moving closer and closer to project completion of 14 staff cabins this semester at our Leadville basecamp. Over spring break and the last weekend, they worked to install the steel framing. This week, the students head back to the fabrication lab in Denver to complete the interiors. Students will begin assembling the cabins in mid-May up at Leadville.
About the Author
View other posts by mmullen